A Ellery company - serving Las Vegas, NV
A garage converted into a bright studio apartment
Cover · Las Vegas

Cover Garage Conversion ADU in Las Vegas, NV

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Las Vegas

Cover Garage Conversion ADU: The Las Vegas Owner’s Guide

A Cover garage conversion ADU in Las Vegas typically runs $118,000 – $186,000 all-in, drawings through final inspection, and the structural and enclosure scope is where most of that money sits. When something in that envelope fails – a header connection, a panel seam, a waterproofing lap – you don’t get a dramatic collapse. You get a hairline crack above the garage door opening, a soft spot in the drywall near the slab, or a ceiling stain that shows up after the first monsoon week in July.

Call (866) 779-3194

Owners usually discover the problem the same way: they’re storing boxes in the new unit, they run a hand along the wall, and the wall gives. Or the door stops latching square because the opening has moved a quarter inch. By the time a symptom is visible on a Cover conversion, the underlying cause has typically been working for a season or two.

Which Cover Models This Applies To

A former garage converted into a guest house

Cover builds its garage conversions around a panelized wall and roof system with a proprietary connection detail at the existing garage opening – the moment you convert a garage, that opening becomes the weakest plane in the structure, and Cover handles it with a specific header-and-post assembly rather than a generic beam. That assembly is what most of the repair work on a Las Vegas Cover conversion touches. We are an independent design-build studio, not affiliated with Cover, and we specify and coordinate their systems under our own single contract.

Identifying the right component starts with the permit set Cover produced for your unit, not with the part in your hand. Look for the stamped drawing sheet showing the opening elevation and the panel schedule; the schedule lists the panel series, and the series determines the connection hardware. Measure the opening width and height to the nearest eighth inch and compare against the schedule before ordering anything. On the OEM-versus-aftermarket question, Cover-specific connection hardware is worth sourcing OEM – the tolerances are tight and a hardware-store substitute will fit but won’t carry the load path the drawing assumes. Finishes, trim, flashing, and sealants can be matched to quality equivalents without the same risk.

Signs Your Cover Garage Conversion ADU Is Failing

  • A diagonal crack radiating from the corner of the old garage door opening. That corner concentrates stress, and a crack there usually means the header connection has lost bearing or the post base has settled. In Las Vegas, caliche-heavy soils and summer shrink-swell cycles make this the first place a conversion shows movement.
  • A door that no longer latches square. When an interior door drifts out of plumb, the frame has racked. It’s a symptom of movement at the opening, not a hinge problem, and adjusting the hinge will only hide it for a season.
  • Soft drywall or efflorescence near the slab line. White powdery staining at the base of a wall means moisture is wicking through the slab edge. Garage slabs aren’t vapor-sealed the way living space requires, and a conversion that skipped a capillary break will show it here.
  • Ceiling or wall stains after a rain event. Cover’s roof-to-wall transition relies on a lapped flashing detail. A failed lap lets water in behind the panel, and you’ll see the stain on the interior before you see the gap on the exterior.
  • Gaps opening at panel seams. Visible separation between panels points to movement in the connection hardware or fastener back-out. On Las Vegas conversions with west-facing walls, thermal cycling from 110-degree afternoons to 70-degree nights works fasteners harder than in milder climates.

Replacement Cost & What’s Included

A bedroom and desk inside a converted garage

Repair and replacement on the structural and enclosure scope of a Cover conversion in Las Vegas runs roughly $2,400 – $9,800 depending on what’s actually moving. A header connection rebuild with new hardware, post base work, and drywall repair sits near the low end. Opening up a wall, correcting a settled post, re-flashing the roof-to-wall transition, and refinishing lands near the high end. Waterproofing and flashing repairs alone typically run $850 – $2,600.

The parts-plus-labor split is written on your estimate, line by line – we don’t bundle hardware into a labor figure to make the number look smaller. Under The Haven Standard, you get a written price before any work starts, and the scope is locked at signing. Workmanship carries a 365-Day Done Right Promise in writing: if it isn’t built to the permitted drawings, we make it right.

DIY or Call Us?

You can safely check a few things. Run a level against the door frame. Photograph any crack with a ruler in frame so you can measure movement over a month. Look at the exterior flashing where the roof meets the wall and note any visible gap. Write down the date of the first stain. That documentation is genuinely useful, and we’ll read it.

What you shouldn’t do is open the wall, cut into the header assembly, or try to re-flash the roof-to-wall transition yourself. The header on a converted garage opening carries the load of the wall above it, and cutting into it without knowing the load path is the kind of mistake that shows up six months later as a sagging ceiling. This is structural work, and it belongs with people who can read the permit set. Our technicians have up to 11 years of experience with these systems. Call (866) 779-3194 and we’ll tell you what we’d check first.

FAQs

An attached garage converted into living space

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
A kitchenette inside a converted garageA new bathroom inside a converted garageThe private side entrance of a junior ADUA compact kitchen inside a new ADUA new modern ADU with wood claddingThe bedroom inside a new ADU

Explore more ADU services

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Las Vegas team

A local vetted partner works across Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need ADU help nationwide? Licensed & insured · free written estimates
Call (866) 779-3194
Local Service Coverage

Request a Free Estimate in Las Vegas

Tell us what you need - Ellery ADU Studio Las Vegas responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch