Site prep is where most Las Vegas ADU budgets quietly break. Caliche under the slab, a 1970s panel with no room for a 200-amp upgrade, a sewer lateral that runs the wrong way under a mature mesquite – these are the line items that surface after you have already spent money on drawings. Ellery ADU Studio builds site prep into the permit set from the start, so the ground, the power, and the sewer are priced in writing before a shovel touches Las Vegas soil. Our technicians have up to 11 years of experience reading Clark County soil reports and utility maps, and they document what they find with a photo record on every visit. Live person answers calls 24/7 at (866) 779-3194.
What Our ADU Site Prep & Utilities Service Includes

Five categories fall under site prep. Each one is scoped, priced, and permitted under the same written contract that covers your drawings and construction. No separate bids to reconcile, no finger-pointing between trades.
Foundation & Grading
Grading sets the finish floor elevation so water sheds away from both the ADU and the existing house, and the foundation transfers load into soil that in much of Las Vegas is caliche – a cemented layer that will not yield to a standard trencher. You need grading and a foundation scope whenever you build detached, and often for a garage conversion where the slab was poured to a shallower depth than current code allows. Ellery ADU Studio reads the soil report, specifies the footing or slab system the lot actually needs, and puts the excavation and concrete line items in the written price before work begins. If the site turns up a surprise like a buried septic tank or abandoned pool plumbing, the photo record shows you exactly what we hit and why the fix is required.
Electrical Panel Upgrade
Most Las Vegas homes built between 1970 and 2000 carry a 100-amp or 125-amp panel, which typically will not support an ADU with electric range, dryer, mini-split heat, and EV charging on top of the main house load. You need a panel upgrade when the load calculation shows the existing service cannot carry both structures, and that calculation belongs in the permit set, not in a conversation at the panel. Ellery ADU Studio runs the load calc, coordinates the service upgrade with NV Energy, and pulls the electrical permit. Panel work is genuinely dangerous – the service entrance stays energized even with the main breaker off – so this is a licensed electrician’s job, and we keep it inside the single contract rather than handing it to a sub you have to vet yourself.
Plumbing Lateral
The lateral is the pipe that carries waste from your ADU to the city sewer main, and it has to connect at the right slope to the right point, which on a typical Las Vegas lot may mean trenching 40 to 80 feet across a finished yard. You need lateral work on almost every detached ADU, and on garage conversions where the existing line is undersized or the wrong material. Ellery ADU Studio locates the existing lateral, confirms the invert elevation with the city, and specifies the connection before the slab is poured. We camera the line and document the condition, so you know whether you are tying into sound pipe or replacing a section while the trench is already open.
Gas Line Extension
If your ADU runs a gas water heater, range, or dryer, the line has to be sized for the added demand and extended from the meter or main trunk to the new structure. You need an extension whenever the ADU’s gas load exceeds what the existing branch can carry, and the sizing depends on distance and pipe diameter, not guesswork. Ellery ADU Studio sizes the run, includes the pressure test and inspection in the scope, and documents the trench and the test results. Gas is the one utility where a leak is not a callback, it’s an emergency, so every connection is pressure-tested and inspected before the meter is turned back on.
Landscaping & Hardscape
Site work leaves a yard in a state, and the ADU needs a path to it, drainage that moves our monsoon rain away from the foundation, and often a small patio for the unit to rent or live well. You need hardscape and landscape restoration whenever the trenching and grading disturb finished yard, and it belongs in the plan from the start so it is not a surprise invoice at the end. Ellery ADU Studio includes the walkway, patio, and drainage scope in the written price, and coordinates desert-appropriate planting so the finished yard survives a Las Vegas summer without a second mortgage on water.
Brands We Service for ADU Site Prep & Utilities
Prefab and modular systems change the site prep scope, and Ellery ADU Studio specifies and coordinates these brands inside the same contract. Abodu units arrive largely finished, which pushes more of the work into the foundation and utility stub-outs – the slab tolerances and connection points have to be exact before the module shows up. Cover’s panelized approach means the foundation and utility layout must match its engineering drawings to the inch, and we build the site work to those drawings rather than adapting after delivery. Dvele modules carry their own electrical and plumbing systems, so the site prep is about getting clean, correctly sized service and drain connections to the module interface.
Mighty Buildings panels and modules have their own foundation and connection specifications, and we coordinate the site work around the delivery sequence so the trenching happens before the crane date, not after. The pattern holds across every system: the site prep has to be built to the manufacturer’s engineering, and we hold both the drawings and the install in one scope so nothing lands on you to arbitrate. Whether you are building with Abodu, Cover, Dvele, Mighty Buildings, or a stick-framed design we draw ourselves, the utilities, the ground, and the paperwork stay under one written price.
Signs You Need ADU Site Prep & Utilities Right Now
- Your panel is already tripping. A main breaker that trips when the dryer and the AC run together is telling you the service is at its limit, and adding an ADU load to a 100-amp panel is not going to work. It matters because a panel upgrade has to be designed into the permit set, not bolted on after the ADU is framed.
- Water pools near the proposed ADU corner. Standing water after a summer storm means the grading is wrong or the soil is not draining, and a foundation poured into that condition will heave and crack. Get it assessed before you pour, because fixing it later means demolition.
- The sewer lateral backs up or drains slowly. Slow drains in the main house can mean a partially collapsed lateral or roots in the line, and an ADU adds flow to a pipe that is already struggling. Camera the line now so you know whether the connection is a tie-in or a replacement.
- Your yard has large mature trees near the build area. A mesquite or palm within a few feet of the new foundation changes the root and grading strategy, and on some lots the setback from the tree is a code question. Knowing this early keeps you out of a redesign after the permit is filed.
- You have a written estimate that skips site work. A quote that prices the ADU but not the trenching, panel, and grading is not a price, it is a placeholder. Bring it to us for a free second opinion and we will tell you what is missing before you sign.
Our ADU Site Prep & Utilities Process – Step by Step
- 1
Site walk and utility locate. We walk the lot, pull the utility locate, and camera the existing lateral to establish what is actually underground. You get a documented photo record of the conditions, not a summary.
- 2
Soil and load assessment. We review the soil report and run the electrical load calculation to determine whether the existing panel and service can carry the ADU. This is where the caliche, the panel, and the lateral get priced into the permit set.
- 3
Site plan and written price. We produce the site plan and the written price for every line item – grading, foundation, panel, lateral, gas, hardscape – before any work starts, per Haven Standard Clause 1. No door-side upsells later.
- 4
Permits and utility coordination. We pull the grading, electrical, plumbing, and gas permits with Clark County and coordinate the service upgrade with NV Energy. Every inspection is scheduled and passed as part of the scope.
- 5
Build, document, and close out. We perform the work, photograph each stage – trench, footing, panel, pressure test – and hand you the complete record at closeout, backed by the 365-Day Done Right Promise.
How Much Does ADU Site Prep & Utilities Cost in Las Vegas?

Site prep for a detached ADU in Las Vegas typically runs $28,000-$55,000 all-in depending on lot conditions, and for a garage conversion the site work often lands in the $8,000-$18,000 range because the slab and most utilities already exist. A 200-amp panel upgrade in Las Vegas generally runs $3,500-$7,500 depending on trenching distance from the meter and whether the service entrance needs rebuilding. A plumbing lateral, trenched and connected with inspection, typically runs $4,000-$9,000 on a standard lot, and gas line extension with pressure test runs $2,500-$6,000. Foundation and grading is the widest band: a straightforward slab on graded soil starts around $12,000, while a lot with heavy caliche or a significant grade change can push past $30,000. Hardscape and landscape restoration runs $3,000-$12,000 depending on the walkway and patio scope.
What moves the number: caliche depth, trench distance to the sewer main and meter, whether the existing panel can be replaced in place or the service entrance has to be rebuilt, and how much finished yard the trenching crosses. To avoid overpaying, get the site work priced inside the ADU contract rather than as a separate change order after the drawings are done – that is the single biggest cost gap on Las Vegas ADU projects. Every Ellery ADU Studio estimate is a written line-item quote with fixed pricing and no change orders, and it includes permits and inspections. If you already have a written estimate from another builder, bring it for a free second opinion and we will tell you what site work it left out.
ADU Site Prep & Utilities Near Las Vegas – Our Service Area
Ellery ADU Studio coordinates site prep across the Las Vegas valley, including Summerlin, Spring Valley, Winchester, North Las Vegas, Paradise, Sunrise Manor, Whitney, Enterprise, Henderson, Boulder City, and Sandy Valley. Soil and utility conditions change block to block – the caliche is heavier on the west side, the sewer laterals run deeper in older central neighborhoods, and the grade shifts as you move toward the foothills. See our ADU Site Prep & Utilities in Summerlin page for the west-side specifics, or start at our home page to see the full scope.
Serving Las Vegas, NV – Our Local Coverage Area
We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – ADU Site Prep & Utilities in Las Vegas

ADU site prep and utilities is the ground and service work that has to happen before and during an ADU build: grading, foundation, electrical panel and service, the plumbing lateral, gas line extension, and hardscape restoration. It is the part of the project that connects the new structure to the city’s infrastructure and to your existing house systems. Ellery ADU Studio prices all of it in writing before work begins, inside the same contract as the drawings and construction.
Site prep for a detached ADU in Las Vegas typically takes 3 to 6 weeks from permit issuance to the point the foundation is ready for framing, and garage conversion site work often runs 1 to 3 weeks. The range depends on caliche depth, trench distance, and how long NV Energy takes to schedule the service upgrade. We sequence the trenching and the crane delivery date together so the site is ready when your module arrives.
Site prep for a detached ADU in Las Vegas typically runs $28,000-$55,000 all-in, and garage conversion site work commonly falls in the $8,000-$18,000 range. Panel upgrades, laterals, and gas lines are priced as separate line items within that total. Call (866) 779-3194 for a written line-item estimate – it is free, and there is no “call for a quote” runaround.
Yes. Ellery ADU Studio specifies and coordinates site prep for Abodu, Cover, Dvele, and Mighty Buildings systems inside the same contract as our own drawn designs. Each manufacturer has its own foundation tolerances and utility connection points, and we build the site work to those engineering drawings. Whether your project uses one of these systems or a stick-framed design, the site prep and utilities stay under one written price.
We handle urgent utility problems – a failed lateral, a gas leak flagged at inspection, a panel that has to be upgraded before an inspection deadline – as priority work, and a live person answers calls 24/7 at (866) 779-3194. Planned site prep is scheduled, not rushed, because rushing ground work is how foundations fail. If you have an active gas leak, call your utility first, then call us.
Site prep and utilities fall under the 365-Day Done Right Promise: if the finished work is not built to the permitted drawings, we make it right, in writing, before the project starts. The promise is backed in writing under The Haven Standard, which also guarantees a written price before work starts and a documented photo record on every visit. You receive the permit set, the photo record, and the written warranty as part of the closeout.
Clear access to the side yard and the proposed ADU area, move vehicles off any path the trenching will cross, and have your existing utility bills and any prior permits ready for our site walk. If you have a soil report or an existing survey, send it ahead; it saves a step. We handle the utility locate and the permits, and we walk you through the photo record of conditions before any work starts.
Schedule Your ADU Site Prep & Utilities Service in Las Vegas Today
Get your site prep priced in writing before you commit to a design. Ellery ADU Studio walks your Las Vegas lot, cameras the lateral, runs the load calculation, and hands you a written line-item quote with fixed pricing and no change orders – backed by the 365-Day Done Right Promise. Call (866) 779-3194 for a free estimate; a live person answers 24/7.