







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateTrusted New Detached ADU for Las Vegas Homeowners
Building a detached ADU in Las Vegas is a permitting problem before it’s a construction problem. Clark County and City of Las Vegas each review setback, height, and lot-coverage rules against an existing parcel, and most homeowners only discover a conflict after they’ve paid a designer. Ellery ADU Studio treats the permit set as the product: drawings, engineering, and construction sit under one contract at one written price, so the designer and builder can’t point at each other when a plan review comment lands. Our technicians have up to 11 years of experience with detached units across the valley, and we answer calls live 24/7. Call (866) 779-3194 to start with a written scope.
What Our New Detached ADU Service Includes
Custom Built ADU
A custom detached ADU is a ground-up structure drawn to your lot’s actual constraints rather than a stock plan forced onto it. You need this when the parcel has an odd shape, an existing pool, a slope, or a recorded easement that rules out the easy placement. We survey the lot, run the setback and lot-coverage math against City of Las Vegas codes, and produce a stamped permit set before a single form is set.

Prefab ADU Installation
Prefab installation means a factory-built unit delivered to your Las Vegas lot and set on a site-prepared foundation, with utility tie-ins and final inspections handled locally. It fits homeowners who want the shell built in a controlled environment and a shorter on-site window. We coordinate the factory, the crane, and the county inspection sequence under the same contract, so the delivery date and the foundation date actually match.

Modular ADU
Modular units arrive as boxes assembled on site, which changes how they clear Las Vegas’s wind and seismic bracing requirements compared with a stick-built frame. This is the route when you want predictable material costs and a unit that’s inspected at the factory as well as in the field. We review the module drawings against local code and manage the foundation, utility, and final inspection scope ourselves.

Studio ADU
A studio ADU is the smallest detached footprint that still functions as a legal dwelling: one open room, a full bath, and a kitchenette. It’s the right call when the goal is rental income or a parent’s separate entrance without maxing out the lot. In Las Vegas, studio units live or die on cooling load, so we specify insulation values and equipment sizing before the permit set is finalized, not after.
1-Bed & 2-Bed ADU
One- and two-bedroom detached units carry more plumbing, more square footage, and more lot-coverage pressure than a studio. You need one when the unit will house a family member long-term or command a higher rent in neighborhoods like Summerlin or Spring Valley. We lay out the floor plan against your actual setbacks first, then confirm the roofline and window placement so the unit reads as a companion structure, not an afterthought.
Brands We Service for New Detached ADU
We specify and coordinate prefab and modular systems from Abodu and Cover, and we’ve worked through enough of their unit layouts to know where the standard floor plan fights a Las Vegas lot. Abodu’s detached models assume straightforward rear-yard access, which is where a parcel with a narrow side gate needs the layout reviewed early. Cover’s panelized approach changes the foundation and crane sequence, and we plan that against the county inspection calendar rather than around it.
We also coordinate Dvele and Mighty Buildings units within the same single contract. Dvele’s high-performance envelope is well suited to desert heat if the mechanical sizing is matched to it, and Mighty Buildings’ panelized assemblies demand a foundation that’s flat to a tolerance most local concrete subs don’t hit by default. Whether you’re weighing a named brand or none at all, our team can help you compare what each system actually costs to land, set, and inspect in Las Vegas.
Signs You Need New Detached ADU Right Now
These are the situations that push homeowners off the fence and into a permit application. None of them are emergencies, but each one gets more expensive the longer the lot sits unused.
- Your lot has clear rear or side yard that zoning allows a unit on. An unused conforming yard in Las Vegas is money sitting still. Confirming the setback and lot-coverage math now tells you whether a detached unit is even buildable before you spend on design.
- A family member needs a separate entrance. Multigenerational living is the most common reason we see detached units go up in Summerlin and Spring Valley. A detached structure gives privacy that an interior conversion can’t, and it holds resale value when the arrangement ends.
- You want rental income but not a shared wall. A detached ADU rents at a premium over a garage conversion because there’s no shared ceiling or door. If the numbers have to work, the detached unit is the one to price first.
- You’re planning a major remodel and want to sequence it once. Site prep, utilities, and trenching cost less when they’re bundled with other work. If a kitchen remodel is already on the table, the trenching line can share the dig.
- You have a written estimate for a garage conversion and it’s climbing. Foundation or ceiling-height issues can push a conversion past the cost of a new detached unit. Bring us any written estimate and we’ll give you a free second opinion on the number.
Our New Detached ADU Process – Step by Step
- 1
Site and feasibility review. We pull your parcel’s zoning, measured setbacks, and lot coverage, then confirm whether a detached unit fits and where. You get the address-level math in writing, not a verbal guess.
- 2
Design and permit set. We produce the drawings, engineering, and permit application as one package and submit it to the City of Las Vegas or Clark County depending on your jurisdiction. Every plan review comment gets answered by us, not handed back to you.
- 3
Written price and contract. Under Haven Standard Clause 1, you receive a written price before any work begins. The scope is locked at signing, so there are no door-side upsells and no change orders for work that was already in the drawings.
- 4
Construction and photo record. Foundation, framing, envelope, and mechanicals proceed against the permitted drawings, with a documented photo record on every visit so you can see what was found and what was done. Our technicians have up to 11 years of experience across these stages.
- 5
Final inspection and 365-Day Done Right Promise. We walk the final inspection with the inspector and hand over a written warranty. If the finished ADU isn’t built to the permitted drawings, we make it right, backed in writing.
How Much Does New Detached ADU Cost in Las Vegas?

A detached ADU in Las Vegas typically runs $180,000 – $280,000 all-in, drawings through final inspection, depending on size and site. A studio unit is the low end of that range; a two-bedroom pushes toward the top. A custom built unit with a non-standard footprint lands higher than a set pre-built model, and prefab installation from brands like Cover or Abodu can sit in the middle once delivery and crane costs are counted.
| Unit type | Typical all-in range |
|---|---|
| Studio detachment (400 – 500 sq ft) | $180,000 – $215,000 |
| 1-bed detached ADU (500 – 650 sq ft) | $210,000 – $245,000 |
| 2-bed detached ADU (700 – 900 sq ft) | $250,000 – $280,000 |
| Prefab installation (unit + set + tie-in) | Varies by brand and crane scope |
What moves the number: soil and grading, utility trench distance to the main, whether the lot needs a retaining wall, and how much cooling capacity the unit requires against your summer load. To avoid overpaying, get the written scope before the drawings and confirm that the “all-in” figure includes the permit set and final inspection, not just framing and finishes. Every Ellery quote is a written price before work begins, per Haven Standard Clause 1, and our free second opinion on any estimate already in hand lets you compare two numbers on the same scope. Call (866) 779-3194 for a written quote on your Las Vegas lot.
New Detached ADU Near Las Vegas – Our Service Area
We handle detached ADU work across the valley: New Detached ADU in Summerlin and New Detached ADU in Spring Valley, plus Winchester, North Las Vegas, Paradise, Sunrise Manor, Whitney, Enterprise, Henderson, Boulder City, and Sandy Valley. Summerlin and Spring Valley lots each carry their own setback and coverage rules, and our New Detached ADU in Las Vegas page covers the city-level code in detail. Response across the metro is typically within a few days for a site visit.
Serving Las Vegas, NV – Our Local Coverage Area
We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – New Detached ADU in Las Vegas

A new detached ADU is a separate, self-contained dwelling built on the same lot as your house, with its own entrance, kitchen, and bath. It’s a ground-up structure, not a conversion, which means the permit set has to clear setback, height, and lot-coverage rules as a new building. In Las Vegas, that also means confirming wind and cooling-load engineering before the drawings are finalized. Call (866) 779-3194 if you want your lot’s coverage math confirmed first.
Plan on 9 to 14 months from signed contract to final inspection, with permit review and construction as the two big blocks. City of Las Vegas plan review and Clark County plan review run on different timelines, and a setback variance adds time if your lot needs one. Construction itself depends on whether the unit is custom built or prefab, since prefab compresses the on-site window. Call (866) 779-3194 for a written schedule tied to your jurisdiction.
A detached ADU in Las Vegas typically runs $180,000 – $280,000 all-in depending on square footage and site conditions, with studios at the low end and two-bedroom units at the top. Utility trench distance, soil, and cooling sizing are the usual swing factors. Every quote we issue is a written price before work begins, and we offer a free second opinion on any written estimate you already have. Call (866) 779-3194 for an exact written quote.
Yes, we coordinate Abodu, Cover, Dvele, and Mighty Buildings units within the same single contract as the site work. Each brand has its own foundation, crane, and inspection sequence, and we plan that early so delivery and site prep line up. If you’re comparing brands, bring the spec sheets and we’ll price the install scope against each. Call (866) 779-3194 to talk through the options.
No, there isn’t, and we won’t claim otherwise: ADU construction is planned work, not emergency work. A live person does answer our calls 24/7, so you can reach us outside business hours to schedule a site visit or ask a question. For a real emergency like a water line break during construction, a licensed plumber handles it first, then we coordinate the repair. Call (866) 779-3194 any time to reach a person.
Every project carries the 365-Day Done Right Promise: if the finished ADU isn’t built to the permitted drawings, we make it right, and that’s backed in writing before the project starts. Workmanship and material warranties attach to the specific scope and are spelled out in your contract, not summarized verbally. The written warranty is handed over at final inspection along with the documented photo record. Call (866) 779-3194 to review the terms before you sign anything.
Gather your property survey if you have one, note any easements or recorded restrictions, and tell us upfront whether a family member or a renter will occupy the unit. That last detail changes the floor plan and the utility sizing early. Confirming lot coverage and setback math before design is the single best way to avoid a redesign later. Call (866) 779-3194 and we’ll walk your lot through the feasibility check first.
Schedule Your New Detached ADU Service in Las Vegas Today
Whether you’re comparing prefab brands or starting from a blank lot, the first step is the same: a written scope and a verified feasibility check. Our ADU Design & Permitting and Site Prep & Utilities work folds into the same contract, so you’re not coordinating three vendors on a six-figure project. A live person answers (866) 779-3194 around the clock, and your free estimate comes with a written price before any work starts.
Written by the team at Ellery ADU Studio.




