A Ellery company - serving Las Vegas, NV
A new modern detached ADU in a backyard

Frequently Asked Questions

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Las Vegas

Frequently Asked Questions About ADUs in Las Vegas

This page answers the questions we hear most often from Las Vegas homeowners weighing an accessory dwelling unit, from what a project actually costs to how permits, drawings, and construction fit under one contract. Every answer below reflects how Ellery ADU Studio works on real projects across the valley, and every price range is the range we write into a quote before any work starts.

The bedroom inside a new ADU

Key Takeaways

  • Garage conversion ADUs in Las Vegas typically run $95,000 – $165,000 all-in; new detached ADUs typically run $210,000 – $340,000, drawings through final inspection.
  • Every project is quoted with a written price before any work begins (Haven Standard, Clause 1). There is no “call for a quote” step.
  • The 365-Day Done Right Promise backs the work in writing: if the finished ADU is not built to the permitted drawings, we make it right.
  • A live person answers calls 24/7. No voicemail queue.
  • We serve Las Vegas and the surrounding valley, including Summerlin, Henderson, North Las Vegas, and Enterprise.

Pricing & Estimates

How much does an ADU cost in Las Vegas?

ADU projects in Las Vegas typically run $95,000 – $340,000 all-in, drawings through final inspection, depending on the type and site conditions. A garage conversion is the least expensive path because the shell, slab, and utility connections already exist; a new detached unit costs more because everything from the foundation up is new. We put a written price on every project before work begins, so the number you see is the number you budget against. For a full breakdown of line items by ADU type, see our guide to ADU design and permitting in Las Vegas.

ADU Type Typical All-In Range What Drives the Spread
Garage conversion $95,000 – $165,000 Slab depth, existing electrical panel capacity, garage door infill
Junior ADU / interior conversion $65,000 – $120,000 Whether a kitchenette and separate entry are added; max 500 sq ft
New detached ADU (600 – 900 sq ft) $210,000 – $340,000 Foundation, new utility trench, square footage, prefab vs. stick-built
Site prep & utilities (standalone) $18,000 – $55,000 Trench length, panel upgrade, grading, drainage

Do you offer free estimates?

Yes. Estimates are free, and we also offer a Free Second Opinion on any written estimate you already have in hand from another contractor. Bring us a competing quote and we will walk through it line by line, including anything missing from the scope. You get a written comparison, not a sales pitch.

Is a written price really guaranteed before work starts?

Yes. Every project is quoted with a written price before any work begins, which is Haven Standard Clause 1. That means the drawings, the permit set, and the construction sit under a single contract at a single written price. If the scope changes because you change your mind mid-project, we price the change in writing before touching it. There are no door-side upsells and no scope creep once the contract is signed.

Is it cheaper to build a garage conversion or a detached ADU?

A garage conversion is almost always cheaper than a new detached ADU in Las Vegas, often by $80,000 or more. You’re reusing the existing slab (typically 4 inches, which is within range for a conversion) and the existing utility connections. If your garage is deep enough and the lot allows it, a conversion is the lowest-cost route to a rentable unit. If you need more square footage or a fully separate structure, a detached ADU delivers that at a higher price.

What payment methods do you accept?

We accept check, ACH bank transfer, and major credit cards. For projects of this size, most clients pay in scheduled draws tied to documented milestones rather than one lump sum. The draw schedule is written into the contract before work starts, so you always know what’s due and what triggers the next payment.

The bathroom inside a new ADU

Service & Scheduling

Do you offer emergency ADU service?

We respond to urgent issues on active projects and completed ADUs 24/7, including water intrusion, utility failures, and anything that affects habitability. A live person answers the phone at (866) 779-3194 at any hour; you will not hit a voicemail queue or a callback promise that doesn’t materialize. For urgent matters, call directly rather than emailing.

How fast can you respond?

We schedule site visits within a few business days of your first call, and we answer the phone 24/7 for anything time-sensitive. During active construction, our crews are on site on the schedule written into your contract. When we come out, you receive a documented photo record of what we found and what we did, not a verbal summary.

Do you handle ADU design and permitting?

Yes. ADU design and permitting is one of our core services, and we treat the permit set as the product, not an afterthought. Our team produces the drawings, coordinates with Clark County or City of Las Vegas plan review, and manages the permit through issuance. The design and the construction are under one contract, so neither side can point at the other when something is off. See our ADU Design & Permitting in Las Vegas page for the full permit process.

Do you handle garage conversion ADUs?

Yes. Garage conversion ADUs are among the most common projects we build in Las Vegas, and we handle them end to end: drawings, permits, structural work, and finishes. We start by verifying the existing slab and panel capacity, since those two items most often drive the all-in price. In older neighborhoods around Downtown and the Huntridge area, we regularly see detached garages with undersized panels that need an upgrade before conversion.

Do you handle new detached ADUs?

Yes. New detached ADUs are a core service, and we build both stick-built and prefab or modular units. We specify and coordinate prefab systems from brands including Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie, all within the same single contract. Prefab can shorten the on-site construction window and reduce weather exposure.

Do you handle junior ADUs and interior conversions?

Yes. Junior ADUs and interior conversions are one of our five service categories. A JADU is capped at 500 square feet and typically shares a bathroom with the main house, which keeps the price lower than a full detached unit. Interior conversions of an existing room into a rentable suite follow the same single-contract model.

Do you handle site prep and utilities?

Yes. Site prep and utilities are a standalone service, and it’s also the step that most often moves a detached ADU budget up or down. Trenching, panel upgrades, grading, and drainage all fall under this category. We assess the site before pricing so the utility line item is written into the estimate, not discovered mid-build.

What areas do you serve?

We serve Las Vegas and the surrounding valley, including Summerlin, Henderson, North Las Vegas, Enterprise, Spring Valley, and the older core neighborhoods near Downtown. Each area has its own plan review path and site conditions. In Summerlin, for example, HOA architectural review often runs in parallel with city permitting, so we build that timeline into the schedule.

How does the project timeline work?

A typical ADU project runs several months from signed contract to final inspection, with permitting often the longest single phase. Here is the sequence we follow on every project:

  1. Site visit and scope: We assess the garage, slab, panel, and lot, and document findings with photos.
  2. Written price: We deliver a written price before any work begins (Haven Clause 1).
  3. Design and permit set: We produce the drawings and submit for plan review.
  4. Permit issuance: We track the permit through Clark County or City of Las Vegas review to issuance.
  5. Construction: Crews build to the permitted drawings, with a documented photo record at each stage.
  6. Final inspection and handover: We close out the permit and hand over the written warranty and photo record.

Timelines vary by ADU type and site; the schedule is written into your contract before work starts.

Licensing, Trust & Guarantees

Are you licensed and insured?

Yes. We are a licensed design-build studio, and our license number appears on every page of this site, verified rather than claimed. Our technicians and crews are background-checked and uniformed, and our license number is on file for any project. Insurance and bonding are in place on every job.

Do you guarantee your work?

Yes. The 365-Day Done Right Promise backs every project in writing: if the finished ADU is not built to the permitted drawings, we make it right. That promise is made before the project starts, not after a problem appears. We also include a documented photo record on every visit so you can see exactly what was built and when.

How do you avoid the designer-versus-builder blame gap?

We avoid it by being both. Ellery ADU Studio is a design-build studio, which means the drawings, the permit set, and the construction all sit under one contract at one written price. When design and build are separate contracts, each side can point at the other when something goes wrong. Under our model, there is no other side to point at.

What is The Haven Standard?

The Haven Standard is the written standard every project is governed by. It has three core commitments: a written price before work starts (Clause 1), a documented photo record on every visit, and the 365-Day Done Right Promise backed in writing. Under Clause 5 (No Surprises), the scope is locked at signing, with no door-side upsells and no scope creep. It’s a standard we agree to, not a marketing line.

Can I get a second opinion on a quote I already have?

Yes. We offer a Free Second Opinion on any written estimate you already hold from another contractor. We’ll review the scope, flag anything missing, and give you a written comparison. This is useful whether or not you hire us, since ADU quotes often leave out utility upgrades or plan review fees.

What experience do your technicians have?

Our technicians have up to 11 years of experience, and our crews work under the same single-contract model as our design team. Experience matters most on the details that drive cost, such as slab conditions, panel capacity, and setback variances, and our technicians have handled those across a wide range of Las Vegas lots. We do not attach a years-in-business claim to the studio itself; what we stand behind is the written price and the written warranty on each project.

Specific ADU Questions

What is an ADU, and why build one in Las Vegas?

An ADU is a secondary dwelling on the same lot as your main house, with its own entrance, kitchen, and bath. In Las Vegas, homeowners build them for rental income, multigenerational living, or long-term asset value. Because the metro core and inner suburbs saw steep price gains between 2015 and 2025, an ADU is often the most cost-effective way to add habitable square footage to a property already owned.

What is a setback variance, and will I need one?

A setback variance is the extra distance the city requires between your new ADU and the property line. Some Las Vegas lots have enough room for a detached ADU without a variance; tighter lots may need one. We check setbacks during the site visit and build any variance timeline into the schedule before you commit.

Do prefab ADUs make sense in Las Vegas?

Prefab ADUs can make sense in Las Vegas because they reduce the on-site construction window and limit exposure to summer heat. We specify and coordinate prefab and modular systems from brands including Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie. Whether prefab or stick-built is cheaper depends on the unit size, site access, and utility work, and we price both before you choose.

Can an ADU be rented out in Las Vegas?

Yes, an ADU can be rented out in Las Vegas, subject to local rules and any HOA covenants that apply to your property. We build rental-grade units with separate entrances and metering where the budget allows. If rental income is part of your plan, tell us at the site visit so we can factor it into the design and utility scope.

What is included in the permit set?

The permit set includes the architectural drawings, structural details, and site plan required for plan review, plus any energy compliance documentation. We treat the permit set as the core deliverable, because a thin permit set is where most ADU timelines stall. You receive a copy of the full set, and it becomes the reference document for construction and the 365-Day Done Right Promise.

What happens if the finished ADU doesn’t match the drawings?

If the finished ADU is not built to the permitted drawings, we make it right under the 365-Day Done Right Promise, in writing. That promise is made before the project starts, so you’re not relying on a verbal assurance after the fact. The documented photo record on every visit gives you the evidence trail to hold us to it.

Still Have Questions?

For anything this page didn’t cover, our team is ready to walk you through pricing, permits, and scheduling. Start with our home page for an overview of the studio, then call us with your specific property details and we’ll set up a site visit. Every project gets a written price before any work begins, and every call is answered by a live person, day or night.

Call Ellery ADU Studio Las Vegas at (866) 779-3194 for a free estimate.

Have a question we didn’t cover? Call Ellery ADU Studio Las Vegas at (866) 779-3194.

Getting started with Ellery in Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Las Vegas team

A local vetted partner works across Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need ADU help in Las Vegas? Licensed & insured · free written estimates
Call (866) 779-3194
Local Service Coverage

Request a Free Estimate in Las Vegas

Tell us what you need - Ellery ADU Studio Las Vegas responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch