A Ellery company - serving Las Vegas, NV
A junior ADU suite with its own kitchen and door

Junior ADU & Interior Conversion Cost in Las Vegas - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Las Vegas
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
An efficiency kitchen in a junior ADU
The private side entrance of a junior ADU
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
A former garage converted into a guest house
The living room inside a new ADU
A bedroom and desk inside a converted garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

How Much Does a Junior ADU & Interior Conversion Cost in Las Vegas?

A junior ADU interior conversion in Las Vegas typically runs $62,000 to $118,000 in 2026, drawings through final inspection. That range covers converting existing square footage inside a single-family home (a spare bedroom, an attached garage bay, or a carve-out from an oversized great room) into a legal, permitted, separately entranced junior ADU with its own kitchenette and bathroom. A straight cosmetic conversion with no new plumbing or electrical runs sits near the bottom of that band; a conversion that adds a wet bath, a 240V kitchen circuit, and a new exterior door from a Las Vegas block wall to the alley moves it toward the top.

Why the range is real and not a hedge: the difference between a $64,000 junior ADU and a $112,000 one in Clark County almost always comes down to four things – whether the existing plumbing stack can be reused, whether the electrical panel has the open capacity a second dwelling unit requires, how far the new entrance has to travel from the property line, and whether the ceiling and slab inside the converted space can stay. Every quote we write is issued as a written price before any work begins, per Haven Standard Clause 1. No “call for a quote” on this page, and none in our process.

If you’re weighing a junior ADU against a full interior conversion elsewhere in the home, the same permit math applies: see our Junior ADU & Interior Conversion in Las Vegas page for the full scope of what gets built.

The sitting area and efficiency kitchen of a junior ADU

Key Takeaways

  • Typical Las Vegas junior ADU conversion: $62,000 – $118,000 all-in, drawings through final inspection.
  • Design and permit set alone: $4,800 – $9,600 in this market.
  • The two line items that move most: new bathroom plumbing ($9,500 – $19,000) and electrical service capacity ($3,800 – $14,500).
  • Clark County junior ADU square footage is capped at 500 sq ft for the junior classification – a smaller footprint than a standard detached ADU.
  • Every project we run comes with a written price before work starts, a documented photo record on every visit, and the 365-Day Done Right Promise.

Junior ADU & Interior Conversion Cost Breakdown (2026)

The table below is the line-item structure we use when pricing a junior ADU conversion in Las Vegas. Ranges reflect 2026 material and labor costs in Clark County and assume an existing single-family home built after 1980 with a compliant lot.

Line Item Typical Range (2026) What’s Included
Design & permit set $4,800 – $9,600 Site survey, architectural drawings, structural calcs if required, MEP sheets, submittal to Clark County and city of Las Vegas, response to plan-check comments
Demolition & selective framing $3,200 – $8,400 Removal of non-bearing walls, framing for the new wet wall and entrance, framing adjustments for the new kitchenette
Electrical service & rough-in $3,800 – $14,500 Panel capacity check, new subpanel if needed, dedicated kitchen circuits, GFCI/AFCI protection, bathroom exhaust, rough wiring to code
Plumbing rough-in & fixtures $9,500 – $19,000 Wet wall for the new bathroom, water heater strategy (tank or tankless), kitchenette drain, fixtures (sink, toilet, shower, faucet)
HVAC extension or mini-split $3,400 – $7,800 Extending the existing system if capacity allows, or a dedicated mini-split for zoning and independent temperature control
Insulation, drywall, paint $4,200 – $9,800 R-value per Title 24, drywall, tape, texture, paint (interior and any new exterior face)
Flooring & finishes $2,800 – $8,600 Flooring throughout, baseboards, trim, kitchenette millwork and countertop, bathroom tile, hardware
Kitchenette package $5,400 – $12,000 Countertop appliance allowance (cooktop, fridge, microwave), sink, cabinet run, under-cabinet lighting
New exterior entrance & site work $3,600 – $9,200 New door, steps or threshold, path from the property line to the entrance, gate hardware, exterior lighting
Fire separation & life safety $1,400 – $3,900 Smoke/CO, fire-rated separation between the junior ADU and the primary dwelling, egress compliance
Permit fees (Clark County) $1,800 – $4,600 Building, electrical, plumbing, mechanical permits and plan-review fees (pass-through, quoted separately in writing)
Final inspection & closeout Included Inspection walk, punch list, certificate of occupancy, documented photo record of every stage

Add the line items together and the math lands in the $62,000 to $118,000 band, which matches what we actually quote in the field. A tight, one-room conversion that reuses an existing bathroom wet wall and doesn’t require a panel upgrade sits at the low end. A conversion that adds a bathroom where one didn’t exist, upgrades the electrical service, and installs a dedicated entrance from a rear alley in Summerlin or Green Valley – where HOA rules and rear-setback distances add scope – lands closer to the top.

One structural note that trips up more Las Vegas homeowners than any other: a junior ADU is a classification, not a size. Clark County limits the junior ADU footprint (roughly 500 sq ft, less than a standard detached ADU), and the unit must be within the existing home’s footprint. If you’re weighing a detached unit instead, our home page outlines the different permit path and cost structure for a new build.

A compact kitchen inside a new ADU

What Affects Junior ADU & Interior Conversion Pricing in Las Vegas

Six factors move the number in this market more than any others. Each one is worth asking about specifically when you compare estimates, because a quote that ignores one of these is a quote that will come back as a change order.

  • Existing plumbing position. If the home already has a bathroom stack near the conversion footprint, the plumbing line item drops by several thousand dollars. If the new junior ADU requires a wet wall in a location with no drain nearby, expect a mid-to-high range plumbing line. In older homes in Paradise and Winchester, we regularly find cast-iron drains reaching the end of their service life – replacing them is not optional if they sit inside the new unit.
  • Electrical service capacity. A junior ADU adds a second dwelling unit, and Nevada code treats it as a load addition. If the existing panel is a 100A service with limited open breakers, the electrical line item can run toward the high end once a service upgrade is folded in. Homes built in the 1990s and early 2000s in Anthem and Southern Highlands usually have enough headroom; mid-century homes often do not.
  • Entrance and egress location. The junior ADU has to have a separate entrance. How far that entrance travels from the property line, whether it crosses a slope, and whether it runs through a legal gate to a public way all drive the exterior scope. A rear-lot entrance from an alley in the older grid neighborhoods of Downtown Las Vegas is often simpler than a side-yard entrance on a >quarter-acre lot.
  • Lot setbacks and HOA review. Setback variance – the extra distance the city requires between a structure and the property line – can force a re-work of the entrance or an exterior step. HOAs in Summerlin, Aliante, and Green Valley Ranch also impose their own review timelines and finish standards. Plan for the review window; it does not raise the build price but it stretches the calendar.
  • Ceiling height and slab condition. A conversion in a garage bay has to solve for the slab (usually fine at 4 inches), the ceiling (usually fine if the space under the joists clears 7 feet 6 inches), and any existing utilities running through the framing. If the slab is settled or the ceiling is low, structural repair enters the scope.
  • Desert climate and Title 24 insulation. Las Vegas sits at roughly 2,000 feet in a Mojave climate with summer highs routinely past 110°F. Junior ADU conversions require Title 24-compliant insulation R-values, and a mini-split is often cheaper over 10 years than extending an existing oversized system. A conversion that doesn’t insulate well feels expensive every August.

For a deeper look at the specific Clark County and city of Las Vegas permit requirements a junior ADU conversion triggers (setbacks, lot coverage, parking, and the junior ADU square-footage cap), see our Las Vegas junior ADU conversion guide.

How to Save on Junior ADU & Interior Conversion in Las Vegas

There are real ways to bring a junior ADU conversion into a lower cost band without cutting the permits, the drawings, or the life-safety scope. The savings come from the framing, not from skipping the paperwork.

  • Pick a footprint that reuses an existing wet wall. A junior ADU placed where a bathroom already exists on the other side of the framing saves the plumbing line item. In many mid-century homes in the Huntridge and Paradise Palms neighborhoods, a spare bedroom sits directly adjacent to a hall bathroom – that’s the ideal plumbing position.
  • Confirm electrical capacity before you commit to the space. A quick load calculation tells you whether a subpanel is enough or a full service upgrade is required. Skipping that step is how a conversion that looked like $68,000 becomes a $90,000 change order. Our written quote includes the panel assessment up front, so there’s no door-side surprise.
  • Choose a mini-split over extending the central system. In Las Vegas, a dedicated mini-split often costs less than extending the existing central HVAC and gives the tenant independent control. It also lets you skip flexing a duct run through a wall you weren’t planning to open.
  • Keep the kitchenette scope lean but permitted. A countertop cooktop, fridge, and sink is the permit path. A full range requires the same drawings but a heavier electrical run. If you plan to rent, most tenants need the countertop package, not a full kitchen.
  • Get your second opinion before you sign. If you already have a written estimate from another contractor, we’ll review it free. If the estimate omits the permit fees, understates the electrical service, or leaves the fire separation out of the scope, that’s exactly what the comparison is for. This is the single fastest way to catch a low bid that will unspool.

Every estimate we issue is written, itemized, and locked before work starts. If you want to compare a plan against a written price, call (866) 779-3194. A live person answers any time, day or night. Estimates are free.

What Is a Junior ADU Conversion, and Why Price It Differently From a Detached ADU?

A junior ADU is a smaller attached unit built within the walls of an existing single-family home, capped at roughly 500 square feet in Clark County. It’s priced differently from a detached ADU because the shell, foundation, roof, and utility hookups already exist – but the interior has to be built to the same life-safety and code standards. That’s why a junior ADU in Las Vegas typically runs $62,000 – $118,000, while a new detached ADU on the same lot runs considerably higher. The savings come from the framing; the permit, MEP, and inspection work do not shrink.

Is a Junior ADU Conversion Cheaper Than a Detached ADU in Las Vegas?

Yes. A junior ADU conversion is typically $62,000 – $118,000 all-in, compared to $180,000 – $340,000 for a new detached ADU on a similar lot in Las Vegas. The gap is real, and it comes from not needing a new foundation, exterior shell, roof, or a separate utility trench. The trade-off is the 500-square-foot junior cap and the requirement that the unit sit within the existing home footprint.

How Long Does a Junior ADU Conversion Take in Las Vegas?

Eight to fourteen weeks from signed contract to certificate of occupancy for a typical Las Vegas junior ADU conversion, with three to six of those weeks in plan review at the city or county. Plan-check comments are the wildcard – a conversion with structural changes or an electrical service upgrade takes longer in review than a straight cosmetic build-out. The build itself is usually five to eight weeks of active construction once permits are issued.

Do I Need a Permit for an Interior Conversion in Las Vegas?

Yes, always. A junior ADU conversion in Las Vegas requires building, electrical, plumbing, and mechanical permits, plus a certificate of occupancy before the unit can legally be rented. Unpermitted conversions can’t be insured as a dwelling unit, can’t be financed, and will surface as a problem at resale. Clark County enforces the junior ADU cap and egress rules during plan review, and the inspection sequence covers framing, rough MEP, insulation, and final. Our permit set is the core product – we don’t begin construction until the plans are approved.

How Much Does It Cost to Add a Bathroom During a Junior ADU Conversion in Las Vegas?

Adding a full bathroom during a junior ADU conversion in Las Vegas costs $9,500 – $19,000 as a standalone line item, including rough plumbing, the wet wall, exhaust, and fixtures. If an existing bathroom wet wall can be reused from the adjacent room, that line item drops toward the low end. If the new bathroom is going into a space with no drain nearby, it runs toward the high end. Call (866) 779-3194 for a written line-item number for your specific space – the panel and slab assessment come first, so there’s no estimate that changes once work starts.

Can You Come Today if I Have a Written Estimate in Hand?

Yes. If you already have a written estimate from another contractor, call (866) 779-3194 and we’ll schedule a free second opinion. A live person answers any time. The second opinion is a read of what the other estimate covers line by line – permits, electrical service capacity, fire separation, wet-wall position – with a written comparison. The 365-Day Done Right Promise applies to any work we take on: if the finished junior ADU is not built to the permitted drawings, we make it right, in writing, before the project starts.

Why the Permit Set Drives the Price More Than Any Other Line Item

In Las Vegas, a junior ADU conversion lives or dies on the permit set. The plan reviewer’s job is to catch the things a homeowner most wants to skip: whether the second dwelling unit has a compliant egress, whether the fire separation between the junior ADU and the primary dwelling is adequate, whether the electrical service has the capacity a second unit pulls, and whether the wet wall reaches the existing drain stack. Every one of those questions is answerable at the drafting table – and expensive to answer after framing.

We quote the permit set as a line item because it is the core product, not a loss leader. The drawings we submit are the drawings the crew builds from, and the drawings the final inspection is checked against. Under Haven Standard Clause 5 (No Surprises), the scope is locked at signing. If the plan reviewer returns a comment that changes the scope, the change order is written and priced before it is built – not after.

This is also why we lead on the details: the existing seven-inch joist bays in a converted garage bay, the drain location, the panel breaker count, the alley-facing entrance. The photos we take and turn over to you match the scope on the page. If you are comparing contractors, ask each one which line item they carry the permit set as. If the permit set is presented as free or included, ask where it lives in the numbers. Our written price is the number.

Prefab and Modular Junior ADU Options in Las Vegas

For some lots, a prefab or modular junior ADU is worth pricing alongside a stick-built conversion. We specify and coordinate systems from Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Tuff Shed, and Plant Prefab within the same single contract, which means the drawings, the delivery, and the site work sit under one scope. Prefab systems don’t always beat a conversion on price in Las Vegas – site work, utility tie-ins, and Clark County review timelines all affect the all-in number – but they’re a real option when the conversion footprint doesn’t fit the existing home. We’ll show you the comparison in writing, not as a sales pitch.

Why Our Written Price Is the Number That Sticks

Most junior ADU estimates come in as a range glued to a low anchor and a high “call for”, with a stack of allowances the client is told to expect will change. We don’t quote that way. Every project we take on, from a $62,000 one-room conversion to a $118,000 top-end scope, carries a written price before work starts. The price reflects a real panel assessment, a real slab check, a real permit submission. It also comes with a documented photo record on every visit, so you see what was found and what was done at each stage, not a summary written a week after the fact.

Our technicians have up to 11 years of experience with the trades and code that govern interior conversions. We’ve designed, permitted, and built 900+ ADUs across Southern California and Nevada under the Haven Standard, which is a written agreement about how projects are priced, documented, and corrected – not a slogan. The 365-Day Done Right Promise covers the finished unit if it drifts from the permitted drawings. And a live person answers the phone any time. No voicemail queue.

Talk Through Your Junior ADU Conversion

If you have a spare bedroom, an oversized garage bay, or a piece of an open floor plan you’ve been wondering about, the useful next step is a written itemization. Not a ballpark, not a range with a call-for on the end – a line-by-line price with the panel assessment and the wet-wall position already worked out. Call (866) 779-3194 for a free estimate. A live person is available any time, and the estimate comes with a documented review of your existing space. If you already have a written number from another contractor, bring it and we’ll review it free. That’s the second opinion, and it’s often the cheapest $0 you’ll spend on the project.

Written by the team at Ellery ADU Studio.

Pricing reflects the Las Vegas market as of 2026. Ellery ADU Studio Las Vegas offers free estimates – call (866) 779-3194.

What Our Customers Say

★★★★★ 5.0 from 3+ reviews

"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."

- Benedict H.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

- Arjun D.

Explore more ADU services

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Las Vegas team

A local vetted partner works across Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need ADU help in Las Vegas? Licensed & insured · free written estimates
Call (866) 779-3194

Request a Free Estimate

Tell us what's going on in Las Vegas. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch