







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateFast, Reliable Junior ADU & Interior Conversion Across Summerlin
If you live in Summerlin and you’re weighing a junior ADU or an interior conversion, you already know the decision has two parts: what the city will allow, and what your HOA architectural committee will approve. Both matter before anyone touches a wall. We work in 89135 constantly, we know the master-plan review process here, and we build the permit and HOA submittal into the same written scope from day one. Call (866) 779-3194 and a live person will pick up, day or night, to schedule a free estimate.

Why Ellery ADU Studio Las Vegas Is Summerlin’s Preferred Junior ADU & Interior Conversion Company

Summerlin homeowners tend to research before they call, and they should. What separates a smooth JADU from a stalled one here isn’t salesmanship, it’s documentation: a permit set, matched stucco and tile samples for HOA review, and a written price before anyone starts. That’s the standard we hold every project to, and it’s why we’ve designed, permitted, and built 900+ ADUs since 2015, each with a written price and a documented photo record.
We’re a design-build studio, so the drawings, the permit set, and the construction are one contract at one price. When the stucco patch has to match your existing wall, or the roofline has to satisfy both the city and the HOA, there’s no designer pointing at a builder or a builder pointing back. Our technicians have up to 11 years of experience, they’re background-checked, and their license number appears on every page. We also offer a free second opinion on any written estimate you already have in hand, which a lot of Summerlin homeowners find useful before they commit.
Our Junior ADU & Interior Conversion Services in Summerlin
Interior JADU
A junior ADU inside the existing footprint is the fastest route to a rentable or family-ready unit in most Summerlin homes, because it doesn’t add square footage or a new roofline. The work usually centers on a den or extra bedroom: a kitchenette, a full bath, a separate entrance, and fire separation where required. Because it stays inside the walls, HOA design review is lighter than for a detached unit, but the interior drawings still need to be on the permit set. A typical interior JADU in Summerlin runs about $95,000 – $150,000 all-in, drawings through final inspection.
Room-to-ADU Conversion
Converting an existing room is the same idea applied to a specific space, and it’s where HVAC math matters most. Summerlin sits at roughly 3,000 feet on the eastern edge of the Spring Mountains, so summers hit sustained 100°F while nights cool off fast. The existing central system rarely has capacity for the added load, so a correctly sized mini-split is usually part of the scope. A room-to-ADU conversion in Summerlin typically lands between $70,000 and $120,000 depending on whether plumbing has to be extended across the slab.
Attached Addition ADU
An attached addition adds new square footage under a shared roofline, which makes it a HOA design question before it’s a construction one. Roof pitch, stucco color, and window style all have to read as part of the original house per Summerlin’s design covenants, and setbacks apply. Attached addition ADUs in Summerlin generally run $180,000 – $280,000 for a 500 – 700 square foot unit, all-in with drawings, HOA submittal, permit, and construction under one contract.
Above-Garage and Basement ADU
An above-garage unit works well where the existing garage is attached and the roofline can carry a second story; we check the structural capacity and the egress path before anything else. True basements are uncommon in Summerlin’s housing stock, so this option is rare here, and we’ll tell you plainly if your lot doesn’t support it rather than force the plan. When the geometry works, both routes are quoted at a written price before any work begins.
Trusted Brands We Service in Summerlin
We specify and coordinate prefab and modular systems from makers like Dvele, Mighty Buildings, and Plant Prefab when a homeowner wants the build timeline tighter or the finish package more controlled. We don’t stock parts and we don’t claim to; we coordinate the system within the same single contract as the design and permit, so the manufacturer’s scope and the site work are reconciled on paper rather than left to a handoff. If you’re comparing a prefab casita against a stick-built conversion in Summerlin, we’ll present both at real Summerlin numbers so you can weigh them.
Common Junior ADU & Interior Conversion Problems We See in Summerlin Homes
- Skipping HOA architectural review before the city permit. In 89135 the community’s design committee often takes longer than the City of Las Vegas permit review. Submit to the HOA first, with stucco and roof tile samples already matched to your house, and the two tracks run in parallel instead of stacking up.
- Undersized cooling for the high-desert climate. A converted garage or an addition carries a load the existing system wasn’t sized for. Insulation and a correctly sized mini-split are not optional at 3,000 feet, where intense UV and 100°F summers punish anything underbuilt.
- Voiding a builder warranty on newer homes. Red Rock-area homes still under warranty need documented approval before anyone alters structural or MEP systems. Undocumented penetrations can void coverage on the very systems you’re modifying.
- Mismatched exterior finishes after wall penetrations. Running a bath vent or a new window through a stucco wall means color-matched patching. On a 1990s Mediterranean-style Summerlin ranch, a visible patch reads immediately and can trigger an HOA correction notice.
Pricing for Junior ADU & Interior Conversion in Summerlin, NV
Summerlin pricing carries real cost that other parts of the valley don’t, mainly because HOA submittal, matched-finish work, and the permit set all have to be handled together. Here’s how it breaks down for typical 89135 jobs:

- Interior JADU (den or bedroom conversion): $95,000 – $150,000 all-in
- Room-to-ADU conversion: $70,000 – $120,000
- Attached addition ADU (500 – 700 sq ft): $180,000 – $280,000
- Above-garage ADU: $160,000 – $240,000, subject to structural check
- Mini-split HVAC upgrade (where the existing system is short): $6,000 – $12,000
Every project is quoted with a written price before any work begins, per Haven Standard Clause 1, so once the scope is locked there’s no change-order drift. Call (866) 779-3194 to schedule your free estimate, and we’ll bring a second-opinion review at no cost if you already have a written estimate from another studio.
We Also Serve Cities Near Summerlin
Our Summerlin work sits inside a wider network of independent local professionals, and homeowners just outside the master plan call on us too. If you’re in Spring Valley, Las Vegas, Winchester, or Paradise, we can bring the same written-price model to your project. See our Junior ADU & Interior Conversion service page for the full scope and standards.
Serving Summerlin, NV – Our Local Coverage Area
We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Junior ADU & Interior Conversion in Summerlin

Yes. Even a fully interior junior ADU in Summerlin goes through the community’s HOA architectural committee, because the review covers the unit’s existence and any exterior work it requires, not just new rooflines. Interior-only work is generally a lighter review than a detached casita, but you still need to file, and the city permit runs alongside it. Call (866) 779-3194 and we’ll walk you through what the HOA packet looks like for your lot.
HVAC is almost always the first upgrade, because the existing central system in a builder-grade Summerlin home can’t carry the added load of a new kitchenette and bath. A correctly sized mini-split and better insulation come before finishes every time at this elevation. Expect $6,000 – $12,000 for the HVAC piece. Call (866) 779-3194 to schedule a free estimate that puts a real number on it.
You can if the alteration is documented and approved before work starts. In newer Red Rock-area homes still under warranty, undocumented cuts to structural or MEP systems can void coverage on the systems you’re modifying. A permit set and a written scope protect you there, which is exactly what the design-build model delivers. Call (866) 779-3194 and we’ll review your warranty terms with you before anything is drawn.
The HOA design covenants control roof pitch, setback, stucco color, and exterior materials, so an attached addition has to read as part of the original house, not a bolted-on box. That means your drawings include sample-matched finishes for the committee. Get this right up front and the approval is routine. Call (866) 779-3194 to schedule a free estimate built around Summerlin’s design standards.
A typical interior JADU reaches completion roughly three to five months after HOA approval, assuming the city permit is filed in parallel. The reason the HOA step matters most: in 89135 the committee often takes longer than the city review, so front-loading the HOA submittal with matched samples is what keeps a project on the homeowner’s schedule. Call (866) 779-3194 to schedule a free estimate and get your timeline in writing.
If you’re ready to move, call (866) 779-3194 for a free estimate. A live person answers around the clock, and you’ll get a written price and a documented scope before any work begins on your Summerlin project.
Written by the team at Ellery ADU Studio.






