A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateWhat a Junior ADU Costs in Las Vegas, NV – and the Two Line Items Every Other Cost Guide Leaves Out
A junior ADU in Las Vegas typically runs $95,000-$165,000 all-in, drawings through final inspection, when it’s built inside the footprint of an existing home. The base number is real, but it’s incomplete. Two costs hit almost every Las Vegas JADU conversion and appear in almost no published guide: a Title 24-equivalent wall assembly upgrade triggered by the energy code ($3,000-$7,000), and a Clark County deed restriction for owner-occupancy ($500-$800 in title and recording). Both are line-itemed in our written quote before work starts. Call (866) 779-3194 for a free estimate and a real number for your house.
Ellery ADU Studio Las Vegas is a design-build studio, and we’ve put 900+ ADUs through design, permitting, and construction since 2015. Every one carried a written price before anybody picked up a hammer.

Why Las Vegas Bedroom Conversions Cost More Than the National JADU Average
Nevada adopted the 2018 IECC as its residential energy code, and Clark County inspectors apply the current continuous-insulation minimums to any envelope you modify. Many Las Vegas houses built before 2014 – which is most of the valley’s stucco-and-frame, slab-on-grade stock – don’t meet those minimums on the walls as originally framed.
Here’s the part that surprises people. Converting a bedroom into a JADU creates conditioned, habitable, separately accessed living space. The inspector looks at the walls you’re touching and applies today’s standard to them, not the standard the house was built to. That usually means one of two fixes:
- Continuous exterior insulation under new stucco – the cleaner thermal result, but it moves your wall plane and can trip setback questions on tight side yards.
- Interior furring with rigid insulation and a new finish layer – less disruptive outside, but it eats 1.5-2 inches of interior floor area and changes door and window reveals.
Either path lands in the $3,000-$7,000 range on a typical 300-square-foot conversion. In older neighborhoods like the Historic Westside, the sun and hard water have already degraded exterior finishes, so the insulation work often pairs with a UV-resistant stucco and paint upgrade. Two costs, one mobilization.
This is exactly why the permit set is the product. A real drawing set shows the wall assembly, the furring detail, and the insulation values before you commit a dollar. Under Clause 1 of The Haven Standard, the price is written before any work begins, so the insulation upgrade is a line item you approve, not a change order that arrives after framing.
What a Las Vegas Junior ADU Actually Costs: The Line Items
Ranges below are for converting existing conditioned space – a bedroom, a den, an oversized primary suite with a sitting room. Detached new construction is a different budget. For that path, see our guide to the new detached ADU in Las Vegas. For the full service picture, the Junior ADU & Interior Conversion in Las Vegas page walks through scope.
| Line item | Typical range |
|---|---|
| Design, permit drawings, and Clark County submittal | $6,000-$12,000 |
| Wall assembly upgrade to current IECC insulation minimums | $3,000-$7,000 |
| Efficiency kitchen (wetbar, sink, small fridge, microwave) | $8,000-$18,000 |
| Bathroom – full bath or 3/4 bath, vented to exterior | $12,000-$26,000 |
| HVAC extension or dedicated mini-split | $4,500-$11,000 |
| Electrical panel capacity check and sub-panel work | $2,500-$8,000 |
| Separate exterior entrance, door, and stoop | $3,500-$9,000 |
| Deed restriction, title work, and Clark County recording | $500-$800 |
| Desert landscaping or hardscape for the entry path | $2,000-$6,000 |
| All-in, drawings through final inspection | $95,000-$165,000 |
Two things about that table. First, the HVAC line is Las Vegas-specific: sustained 110°F+ summers and the July-to-September monsoon push cooling loads hard on an addition that shares no thermostat with the main house, and a dedicated system is often the cheaper long-run answer. Second, the landscaping line isn’t optional decoration – Southern Nevada’s water-conservation rules mean virtually no lawn, so every JADU needs its own drip-irrigated desert planting or hardscape.
The prefab and modular route changes the math on detached units rather than interior conversions. If you’re weighing a factory-built shell from Cover, Dvele, or Mighty Buildings, we specify and coordinate those systems inside the same single contract, so the site work, utility trenching, and hookups still come through one written scope.

JADU Kitchen Rules, Deed Restrictions, and HOA Clauses: What to Check Before You Sign
Three approval questions decide a Las Vegas JADU before price enters the conversation. Answer them first, and the number you get at the end will hold.
Does a JADU need a full kitchen in Clark County?
No. A JADU is allowed an efficiency kitchen – wetbar sink, small refrigerator, microwave, limited cooking appliance – and that distinction keeps the permit classified as a JADU rather than a full ADU. It also saves real money: a full kitchen runs roughly $20,000-$45,000 against $8,000-$18,000 for the efficiency version. What you give up is full cooking capability. What you keep is a legally separate, rentable unit. If your plans need a full kitchen, the project moves into ADU territory and the rules shift, which is worth a conversation before design starts.
Is a deed restriction required, and what does it cost?
Yes. JADUs require the owner to occupy the primary residence, and that condition is recorded against the property with Clark County. Budget $500-$800 in title and recording fees. It’s small next to the construction budget, which is exactly why it gets dropped from most cost summaries – and then shows up as an unwelcome surprise. On every ADU project we run, the recording is a scheduled step, not a contingency.
Can my HOA block a JADU entrance?
Sometimes yes. A JADU requires a separate exterior entrance, and some Las Vegas master-planned communities restrict separate entrances on street-facing elevations. That’s a design constraint with a cost attached: a side-yard or rear entry may need a longer path, a covered stoop, and additional hardscape. We read your CC&Rs before the quote is issued, not after. It’s why our quotes for two houses on the same street can differ by $15,000.
How We Price a Las Vegas JADU Differently
One contract covers the drawings, the permit set, and the construction at one written price. Neither the designer nor the builder can point at the other when something is off, because there’s nothing to point at. Our technicians have up to 11 years of experience, and the license appears on every page – verified, not claimed.
What you receive as documentation: the permit set, a photo record from every visit, a written scope, and the 365-Day Done Right Promise in writing. Under Clause 5 (No Surprises), the scope is locked at signing. No door-side upsells. No scope creep after framing.
If you’re holding a written estimate from another builder, our Free Second Opinion costs you nothing. We’ll tell you whether the insulation upgrade and the deed restriction are in it – because if they aren’t, the number you have isn’t the number you’ll pay.
FAQs
A junior ADU in Las Vegas typically costs $95,000-$165,000 all-in, drawings through final inspection. The range swings on whether the walls you’re modifying need a full exterior insulation rebuild, whether the bathroom is a 3/4 or full bath, and whether your HOA restricts the entrance location. Call (866) 779-3194 for an exact quote on your house – estimates are free and written.
Two reasons, mostly. Current IECC insulation minimums apply to any wall you modify during a conversion, and many pre-2014 Las Vegas homes don’t meet them, adding $3,000-$7,000. Extreme heat and the monsoon season also drive a dedicated HVAC system and upgraded exterior materials – UV-resistant stucco and cool roofing hold up better under the valley’s sun and hard water. Call (866) 779-3194 and we’ll walk your specific walls and roofline.
Converting existing space is nearly always cheaper – $95,000-$165,000 for an interior JADU against a detached new build, which runs substantially more. The tradeoff is size and privacy: you’re limited to the footprint you already have, and the JADU shares a wall with the main house. Either path moves through the same single contract with us. Call (866) 779-3194 for a side-by-side written comparison.
Design and permit submittal can begin as soon as you approve the written scope, though Clark County review timelines set the construction start. We answer calls live 24/7, so you’re not waiting on a callback to get moving. Call (866) 779-3194 and we’ll give you the current realistic timeline for your address.
Get Your Written JADU Price
Every junior ADU we build starts with a written price – insulation upgrade, deed restriction, HVAC, and all – before any work begins. No change-order surprises after framing. Call (866) 779-3194 for a free estimate on your Las Vegas conversion, or bring us a written estimate you already have for a free second opinion. A live person answers, day or night.
Written by the team at Ellery ADU Studio Las Vegas, serving Las Vegas, NV.
What Our Customers Say
"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."
- Benedict H."The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."
- Helena V."Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."
- Arjun D.