







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateADU Services in Summerlin, NV
If you own a home in Summerlin, you already know the paperwork starts before the concrete does. Almost every accessory dwelling unit here needs a city permit and a separate sign-off from the community’s architectural review committee, and the two don’t move at the same speed. We’re Ellery ADU Studio, and we build ADUs across Summerlin from the drawings through final inspection under one contract at one written price. Call (866) 779-3194 and a live person picks up. We’ll tell you what your lot in 89135 can realistically hold before you spend a dollar on design.
Why Summerlin Homeowners Choose Ellery ADU Studio Las Vegas

Summerlin homeowners research before they call, and we respect that. They want to see the permit set, the line items, and the warranty language before anyone swings a hammer. That’s the whole reason The Haven Standard exists: a written price before any work starts, a documented photo record on every visit, and a 365-Day Done Right Promise backed in writing. Our technicians have up to 11 years of experience, and every crew is background-checked and licensed, with the license number printed on the paperwork you receive.
We’ve designed, permitted, and built more than 900 ADUs since 2015, and we’ve spent a good share of that time in Summerlin neighborhoods like The Trails and Red Rock Country Club, where HOA covenants add a layer most contractors underestimate. If you already have a written estimate from someone else, we’ll give you a free second opinion on it. No pressure, just a straight read on what’s missing.
ADU Services We Offer in Summerlin
One studio handles the drawings, the permit set, and the construction. That closes the gap where a designer blames the builder and the builder blames the designer. Here’s what we cover in Summerlin.
ADU Design & Permitting
We produce the full permit set and shepherd it through both the City of Las Vegas and your Summerlin architectural committee. The drawings are the product, not an afterthought, and they’re matched to your existing stucco and tile before submittal. Learn more about our ADU Design & Permitting in Summerlin.

Garage Conversion ADU
Older single-story Summerlin homes with attached garages convert cleanly, and we check the slab thickness before we quote the foundation line item. Learn more about our Garage Conversion ADU in Summerlin.

New Detached ADU
Newer Red Rock-area lots with deeper setbacks are the better fit for a detached casita, and we size the footprint to what your side-yard easements allow. Learn more about our New Detached ADU in Summerlin.

Junior ADU & Interior Conversion
A JADU lives inside the existing footprint, which can sidestep some of the detached-unit review. We handle the interior build-out, egress, and utility tie-ins.
ADU Site Prep & Utilities
Grading, drainage, and utility runs come first, especially where monsoon flooding needs to move away from the main house. We handle the site work under the same contract as everything else.
Neighborhoods We Serve in Summerlin
We work throughout Summerlin, and most site visits are scheduled within a few business days of your call. The neighborhoods below come up most often, though the HOA rules and lot sizes shift block to block, so we treat each address on its own.
- The Trails
- Red Rock Country Club
- Willow Creek
- The Ridges
- Sun City Summerlin
Why Summerlin’s Climate & Housing Affect ADU
Summerlin sits at the eastern edge of the Spring Mountains, around 3,000 feet, so it runs cooler than the Valley floor but still takes sustained 100°F-plus summers. That makes insulation, a cool-roof assembly, shade, and a correctly sized mini-split non-negotiable, not optional upgrades. The UV here is brutal on stucco and low-slope roofs, so exterior materials get specified for sun exposure, not just looks. Then there’s the housing stock: 89135 is mostly 1990s-to-2000s Mediterranean and Southwestern stucco-and-tile homes on HOA-governed lots, often with small rear yards, side-yard easements, and existing pool equipment pads that limit where a detached unit can physically sit. Older single-story ranches with attached garages convert well; newer Red Rock-area builds with deeper lots suit a detached casita. And because the Spring Mountains funnel monsoon rain fast, every detached unit needs grading that pushes water away from the main house.
Pricing for ADU in Summerlin
Every project gets a written price before any work begins, per Haven Standard Clause 1, so what follows are honest ranges, not bait. A garage conversion typically lands in the mid-five figures; a new detached casita runs higher, and interior JADU build-outs sit below both. Your Summerlin HOA review timeline doesn’t add cost, but it does add weeks, and we plan for that. Under Clause 5, No Surprises, the scope is locked at signing, so there are no door-side upsells once crews are on site. Call (866) 779-3194 for a written estimate on your address; estimates are free.
Service Area – Cities Near Summerlin
Summerlin borders several communities we also serve, including home coverage across Spring Valley, Las Vegas, Winchester, and Paradise. If your property sits near the Summerlin edge, tell us the cross streets and we’ll confirm the review authority before we quote.
Serving Summerlin, NV – Our Local Coverage Area
We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About ADU in Summerlin

In most cases, yes. Summerlin is a master-planned community with design covenants on setbacks, roof pitch, and exterior materials, so your project runs through both the City of Las Vegas and the architectural review committee. We sequence the HOA submittal first, with stucco and tile samples pre-matched, because that review often runs weeks longer than the city permit. Call (866) 779-3194 to talk through your lot.
Ranges vary by type, but a garage conversion sits in the mid-five figures all-in and a new detached casita runs higher, drawings through final inspection. You get a written price before any work starts, per Haven Standard Clause 1. Call (866) 779-3194 for an exact written quote; estimates are free.
No. Under Haven Clause 5, No Surprises, the scope and price are locked at signing, so there are no change orders for work that was already in the drawings. If something genuinely unforeseen comes up, you see the photo record and a written change before anyone proceeds. Call (866) 779-3194 with questions.
Older single-story ranches with attached garages in The Trails and Willow Creek tend to convert cleanly, while newer Red Rock-area lots with deeper yards suit a detached casita. We check slab thickness and easements before quoting. Call (866) 779-3194 to schedule a free site check.
Yes. We specify and coordinate prefab and modular systems from Abodu, Cover, Dvele, and Mighty Buildings inside the same single contract, so the factory unit and the site work stay under one written price. Call (866) 779-3194 to compare a prefab option against a site-built casita.
An ADU in Summerlin is a long-term asset, and the decisions that matter most happen before construction: the permit set, the HOA submittal, and a written price you can hold us to. We’ll walk your lot in 89135, show you what the drawings would look like, and put a number on the page before you commit to anything. Call Ellery ADU Studio at (866) 779-3194 to schedule your free estimate.
Written by the team at Ellery ADU Studio Las Vegas.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local ADU pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Summerlin Customers Say
"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."
- Benedict H."The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."
- Helena V."Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."
- Arjun D.




