Title 24 Energy Compliance in Las Vegas, NV
Title 24 energy compliance is the documentation that proves a new or altered Las Vegas home meets California’s energy code before it can pass final inspection. On an ADU project it covers the building envelope, windows, insulation, water heating, lighting, and HVAC, and the Las Vegas field inspector holds the certificate until it lines up with the permitted drawings. We handle the modeling, the forms, and the inspection coordination inside the same contract that produces your drawings, so the energy calcs, the permit set, and the finished building are never three separate conversations. Call (866) 779-3194 to get a written price before any work starts.
This page sits under our main ADU Design & Permitting service. If your project has already broken ground before you’ve read this page, call us anyway and we’ll sort out where the Title 24 piece sits.
Key Takeaways
- Title 24 is not a checkbox. It’s a performance model of your specific ADU, and Las Vegas inspectors read it line by line.
- Every one of the 900+ ADUs we’ve designed, permitted, and built since 2015 carried a written Title 24 package in the permit set.
- Our technicians have up to 11 years of experience modeling and coordinating energy compliance on Las Vegas ADU projects.
- Pricing is on this page. We don’t ask you to “call for a quote” because Haven Clause 1 doesn’t allow it.

When You Need Title 24 Energy Compliance
Not every ADU project touches the energy code the same way. These are the scenarios we’re asked about most often.
- You’re building a new detached ADU. Any new conditioned floor area in Las Vegas triggers a full Title 24 report, from prescriptive envelope compliance through the final compliance certificate posted before you call for inspection.
- You’re converting a garage. A garage conversion from unconditioned storage to living space is the single biggest energy code jump in the code book, because you’re taking a wall assembly designed to be vented and turning it into a conditioned envelope. Insulation, slab edge, and window spec all change.
- You’re swapping the water heater or HVAC. A heat pump water heater or a new mini-split in an existing ADU alteration can kick the project into performance compliance, even if the shell doesn’t change. The paperwork trail is different from a prescriptive envelope.
- Your permit set is being kicked back. If your plan reviewer flagged “Title 24 missing” or rejected the CF1R because the window U-factor doesn’t match the spec sheet, the fix is a corrected model, not a conversation with the counter.
- You’re building a prefab or modular unit. Brands like Abodu and Cover ship with factory energy documentation, but that documentation still needs to be reconciled with the Las Vegas site plan and your specific foundation. That reconciliation is on us.
- You’re in a historic or hillside-overlay area where the local jurisdiction wants additional envelope justification. Las Vegas has pockets where the standard prescriptive path isn’t accepted and the performance path is required, no matter how small the ADU.
Our Title 24 Energy Compliance Process
- We model your ADU against the Las Vegas climate zone. Las Vegas sits in a hot-dry climate zone, which means envelope values and HVAC efficiency numbers behave differently here than the same drawing would in a coastal California city. We build the model off your actual drawings, not a template.
- We pick the compliance path and lock it. Prescriptive is faster and cheaper to document. Performance gives more design flexibility but requires a full computer model. We tell you which one your project qualifies for and why, and we don’t bounce between paths mid-permit.
- We coordinate the equipment specs with your vendor. Window U-factors, HVAC SEER2 and HSPF2 ratings, water heater efficiency, and lighting power density all need to match what’s actually being installed. Under Haven Clause 5 (No Surprises) the scope is locked at signing, so if the equipment spec changes, the model gets updated in writing, not in a phone call three weeks later.
- We prepare the CF1R and CF2R forms and the compliance certificate. You receive the completed forms in the permit set, signed and stamped by the licensed energy consultant on our contract, along with the drawing sheets that reference them.
- We file with the city and answer the plan-check comments. If the reviewer wants a corrected HERS registration or a clarification on the duct leakage assumption, that response is on us, not on you.
- We post the compliance certificate before final inspection. The finished ADU gets the certificate, and it’s part of the documented photo record for that visit so you have physical proof it was posted.
Design and permitting decisions interact here in ways that surprise homeowners. A high-performance window substitution that saves $400 on materials can fail the prescriptive U-factor by 0.02 and require a full performance model, which costs more than the window saved. Fixing that early is the entire point of doing Title 24 inside the permit set instead of as an add-on.

Title 24 Energy Compliance Pricing in Las Vegas
Ranges below are for the energy modeling, paperwork, and inspection coordination on a typical Las Vegas ADU project. Every project is quoted with a written price before any work begins, per Haven Standard Clause 1.
| Line item | Typical range |
|---|---|
| Prescriptive envelope report – small ADU (under 500 sq ft) | $550 – $850 |
| Prescriptive envelope report – 500 – 800 sq ft ADU | $750 – $1,150 |
| Performance-modeled report (CF1R via approved software) | $950 – $1,800 |
| Garage conversion energy documentation | $650 – $1,250 |
| Prefab/modular reconciliation with site plan | $450 – $950 |
| Plan-check response and correction round | $150 – $400 per round |
| HERS rater coordination (duct leakage, envelope) | $350 – $700 |
Three things move the number most. First, performance vs. prescriptive: if your design calls for glazing percentages or shaded exposures that the prescriptive path won’t accept, the model is unavoidable and it costs more. Second, garage conversions, because converting unconditioned storage to conditioned living space requires new documentation on the slab, walls, and ceiling assembly together. Third, prefab – brands like Dvele and Mighty Buildings ship a factory energy package that has to be reconciled with the Las Vegas site plan, and that’s a real modeling task, not a formality.
If you already have a written estimate in hand from another firm, send it over. A Free Second Opinion on any written estimate is part of how we work – no obligation, no pressure, just a second set of eyes on the Title 24 scope and what’s missing from it.
One note on the climate zone that we always flag: Las Vegas’s hot-dry profile means the envelope is the dominant load driver. That means insulation values and window spec decisions deserve more attention on this page than the mechanical schedule, and if your design team hasn’t explicitly modeled the summer peak, ask why.
If you’re pricing a larger build, our home page lays out how the design-build single contract works across all five of our service categories, and the ADU Design & Permitting in Las Vegas page walks through the full permit process your Title 24 documentation will live inside. For related reading across the metro, see our ADU Design & Permitting service overview, and for a nearby comparison, our Garage Conversion ADU page covers the specific energy documentation jump that trips up conversion projects.
Three more pages that answer the questions homeowners actually send us: New Detached ADU, Junior ADU & Interior Conversion, and ADU Site Prep & Utilities. If you’re weighing prefab, Prefab ADU is the honest read on where the energy documentation gets messy. And for readers further out, ADU Design & Permitting in Henderson and ADU Design & Permitting in North Las Vegas cover those jurisdictions’ own review habits.
Two more reads before you call: ADU permit cost in Las Vegas for the full fee breakdown, and how long an ADU permit takes in Las Vegas for the timeline your Title 24 review sits inside. And our ADU cost in Las Vegas page pairs the energy line item with every other line on the project budget.
FAQs – Title 24 Energy Compliance
How much does Title 24 energy compliance cost in Las Vegas?
Title 24 energy compliance for a Las Vegas ADU typically runs $550 – $1,800 depending on whether the project follows the prescriptive path or requires a full performance model, plus $150 – $400 per plan-check correction round if the reviewer asks for changes. Garage conversions land in the middle of that range because the envelope work is more involved than a new detached build of the same size. The written price is locked at signing under Haven Clause 1, so the number in your contract is the number you pay. Call (866) 779-3194 for an exact figure on your specific drawings.
Can Title 24 documentation hold up my ADU permit in Las Vegas?
Yes, and it does hold up permits regularly. Las Vegas plan reviewers will reject a permit set that’s missing the CF1R, has a window U-factor that doesn’t match the equipment spec, or shows a duct leakage assumption that doesn’t line up with the construction. The fix is a corrected model and a resubmittal, which is why we build the Title 24 work in from the start rather than tacking it on at submission. If your project is already stuck on a Title 24 issue, call (866) 779-3194 and we’ll diagnose it before anything else.
Do prefab and modular ADUs from Abodu or Cover come with Title 24 already done?
They come with factory energy documentation, not with a completed Las Vegas Title 24 report. The factory package documents the unit’s construction and mechanical efficiencies; it doesn’t reconcile those efficiencies with your site-specific foundation, orientation, and shading in a model the Las Vegas plan checker will accept. We specify and coordinate Abodu, Cover, Dvele, and Mighty Buildings systems within the same contract, and that reconciliation is a real line item, typically $450 – $950 on top of a standard ADU. Call (866) 779-3194 and we’ll tell you exactly what your prefab’s package is missing for Las Vegas.
Can you handle Title 24 for a garage conversion when another firm already drew the plans?
Yes. Garage conversion energy documentation is one of the more common jobs we get pulled into mid-project because the original drafter left the conditioned-envelope jump out of the scope. We’ll review the existing drawings, model the conversion against Las Vegas’s climate zone, and produce the CF1R without anyone needing to redraw the shell. If you already have a written estimate from the other firm, that’s exactly the kind of document our Free Second Opinion covers. Call (866) 779-3194 and we’ll start the review.
Contact Ellery ADU Studio Las Vegas
Title 24 energy compliance is the kind of line item that either disappears into the permit set or derails the project at plan check, and the difference is whether it was modeled properly the first time. We’ve built 900+ ADUs across the Las Vegas metro since 2015 with every one carrying a written Title 24 package, a documented photo record, and the 365-Day Done Right Promise backing the whole thing. Under Clause 1, your price is written before any work starts. A live person answers our line 24/7, not a voicemail queue. Call (866) 779-3194 for a free estimate on your Las Vegas ADU’s energy compliance, drawings through final inspection.
Written by the team at Ellery ADU Studio Las Vegas, serving Las Vegas.


